Explore the equipment catalogue

Showing the first 40. Add a model name to narrow your search.

UA-Button · Perth installation

UniFi Access Button
Installation Perth.

Plan your UniFi Access Button fitting and compatibility in Perth with Servicewest. We assess the site and supporting equipment before specifying UA-Button.

  • Exact host model
  • Mounting or interface compatibility
  • Supporting parts and access
Request a site assessment Australian model, compatibility and procurement checked before the scope is confirmed.

Installing Access Button. Start with the site.

Fit Access Button to the right equipment.

The Access Button (UA-Button) needs to be matched to the host device and the intended installation. Similar-looking mounts, adapters and accessories can have different attachment points or electrical requirements. Send us the model number of the equipment you already own so we can check the pairing before quoting.

Installation details for UA-Button

Power Method: UniFi Access Hubs UL 294 Power-limited Class 2 PSU UL 60950-1/62368-1 LPS/PS2 PSU. Dimensions: 137 x 88 x 38.1 mm (5.4 x 3.5 x 1.5"). Ambient Operating Temperature: 0 to 40° C (32 to 104° F). These manufacturer figures inform the mounting, connection and site assessment; we check the final model and supporting equipment before installation.

Check the physical detail.

We check the manufacturer compatibility information, the location where the accessory will be used and any supporting parts required. The installation scope identifies what is included, what is already on site and any items that need replacement.

Include it in the wider installation.

Accessory work is scoped alongside the equipment it supports. Tell us whether this is part of a new installation, a repair or an expansion. We can then plan access to the equipment and any interruption needed to fit and test the part.

Know the
equipment.

Manufacturer specifications for UA-Button. Check the selected model, regional version and current software requirements during assessment.

View manufacturer source
Mechanical
Dimensions137 x 88 x 38.1 mm (5.4 x 3.5 x 1.5")
Weight180 g (6.3 oz)
Enclosure MaterialPolycarbonate
Mount MaterialPolycarbonate, SGCC steel
Available ColorsBlack, white
Indoor and Outdoor UseIndoor only
Hardware
Mechanical Life1,000,000 clicks
Power MethodUniFi Access Hubs UL 294 Power-limited Class 2 PSU UL 60950-1/62368-1 LPS/PS2 PSU
Contact Type(1) Normal open
Contact Rating30V DC, 2A
UL 294 LevelDestructive attack: Level I Line security: Level I Endurance: Level I Standby power: Level I
UL 294 StatementCompliance with IEEE 802.3 (at or af) specifications was not verified as part of UL 294. The equipment is intended to comply with the section of the National Electrical Code, ANSI/NFPA 70, Article 725.121, Power Sources for Class 2 and Class 3 Circuits.
CAN/ULC-60839-11-1 GradeGrade assignment: 1
Document number, and issue date and/or revision levelUA-Button, V01
Ambient Operating Temperature0 to 40° C (32 to 104° F)
Ambient Storage Temperature-40 to 70° C (-40 to 158° F)
Ambient Operating Humidity5 to 90% noncondensing
CertificationsCE, UL 294, CAN/ULC-60839-11-1

Plan the supporting equipment. Check the complete system.

Related catalogue items to discuss. Compatibility is checked against the exact model and site design.

A few practical questions.

Can you assess Access Button for an existing system?
Yes. Include UA-Button, your existing console or host equipment, and a brief description of the work in your enquiry. We check compatibility, capacity and site access before confirming the installation scope.
What should I send for a Access Button assessment?
Send your suburb, property type, the intended location and any existing equipment model numbers. Exact host model and mounting or interface compatibility are useful starting points. Photographs of the proposed location can help with the initial discussion.
Does this page confirm Australian stock or a fixed installation price?
No. This catalogue uses manufacturer product references. We confirm the suitable Australian model, procurement options and a site-specific scope before quoting.

Keep planning.

Let’s look at your site.

Good installations
start with a conversation.

Tell us your suburb, your property and what you want to connect. We’ll work through the equipment and the installation with you.