Explore the equipment catalogue

Showing the first 40. Add a model name to narrow your search.

USP-PDU-Pro · Perth installation

UniFi Power Distribution Pro
Installation Perth.

Plan your UniFi Power Distribution Pro installation in Perth with Servicewest. We assess the site and supporting equipment before specifying USP-PDU-Pro.

  • Australian model and supported services
  • Network, mounting and power
  • Account ownership and maintenance
Request a site assessment Australian model, compatibility and procurement checked before the scope is confirmed.

Installing Power Distribution Pro. Start with the site.

Define the job for Power Distribution Pro.

We review what USP-PDU-Pro needs to do within your property and which UniFi applications or supporting devices it requires. Existing network capacity, mounting, account access and the Australian model are checked before the equipment list is finalised.

Installation details for USP-PDU-Pro

Power Method: 125V AC, 15A Max., 50/60 Hz. Max. Power Consumption: 125V AC: 1,875W. Networking Interface: (1) 100 MbE RJ45 port (3) GbE RJ45 ports. Dimensions: 442.4 x 87.4 x 106 mm (17.4 x 3.4 x 4.2"). Ambient Operating Temperature: 0 to 40° C (32 to 104° F). These manufacturer figures inform the mounting, connection and site assessment; we check the final model and supporting equipment before installation.

Review the load and the power arrangement.

Power connections, the intended load and the required backup function determine suitability. Runtime varies with the connected equipment and battery condition. We confirm the Australian configuration and installation responsibilities before specifying the unit.

Document how the addition is used.

Configuration and testing cover the functions agreed for this installation. We explain the controls and assign ownership of routine administration, updates and any backup responsibilities. Supporting equipment is selected for this exact model.

Know the
equipment.

Manufacturer specifications for USP-PDU-Pro. Check the selected model, regional version and current software requirements during assessment.

View manufacturer source
Mechanical
Dimensions442.4 x 87.4 x 106 mm (17.4 x 3.4 x 4.2")
WeightWithout mount: 3.5 kg (7.6 lb) With mount: 3.7 kg (8.2 lb)
Enclosure MaterialSGCC steel
Hardware
ManagementEthernet
Networking Interface(1) 100 MbE RJ45 port (3) GbE RJ45 ports
Power Method125V AC, 15A Max., 50/60 Hz
Power SupplyAC/DC internal, 40W
Max. Power Consumption125V AC: 1,875W
Power Output(16) Power control outlets, 125V AC, 15A Max., 50/60Hz (1,875W Max. total) (4) USB-C ports, 2A Max. per port (4A/20W Max. total)
Display1.3" touchscreen
Buttons(1) Factory reset (1) Circuit breaker
Ambient Operating Temperature0 to 40° C (32 to 104° F)
Ambient Operating Humidity10 to 90% noncondensing
CertificationsFCC, IC

Plan the supporting equipment. Check the complete system.

Related catalogue items to discuss. Compatibility is checked against the exact model and site design.

A few practical questions.

Can you assess Power Distribution Pro for an existing system?
Yes. Include USP-PDU-Pro, your existing console or host equipment, and a brief description of the work in your enquiry. We check compatibility, capacity and site access before confirming the installation scope.
What should I send for a Power Distribution Pro assessment?
Send your suburb, property type, the intended location and any existing equipment model numbers. Australian model and supported services and network, mounting and power are useful starting points. Photographs of the proposed location can help with the initial discussion.
Does this page confirm Australian stock or a fixed installation price?
No. This catalogue uses manufacturer product references. We confirm the suitable Australian model, procurement options and a site-specific scope before quoting.

Keep planning.

Let’s look at your site.

Good installations
start with a conversation.

Tell us your suburb, your property and what you want to connect. We’ll work through the equipment and the installation with you.